The Electricity and Water Authority (EWA) appointed ESB International to conduct the studies, design, tender evaluation, and supervision of the upgrade f the Integrated Control System (ICS) for Hidd 220 kV Bulk Supply Point substation.
- Hot-Hot Gateways upgrade
- Upstream IEC104 Protocol
- Downstream IEC61850 Protocol
- Fibre cables and PRP network configuration
- Human Machine Interface
- SDH (WAN) telecommunication
- Uninterrupted Power Supply (UPS)
- Bay Control Units (BCUs)
- Cyber Security
- Reduced the total cost of ownership by diminishing maintenance costs.
- Boosted performance, reliability, and efficiency while reducing downtime.
Categories :
Transmission & Distribution
locations :
Bahrain
Visual List :
Case Study List - Upgrading Hidd Substation in Bahrain
Quote :
More About Us
Contact Us
Dublin Office
Address
ESB International,
One Dublin Airport Central,
Dublin Airport Cloghran,
Co Dublin,
K67XF72
One Dublin Airport Central,
Dublin Airport Cloghran,
Co Dublin,
K67XF72
Phone
+353 1 703 8000
+353 1 703 8000
Email
marketing@esbi.ie
Bahrain Office
Address
ESB International Office 1002,
Building 655 Road 3614,
Block 436,
Seef Area,
Bahrain
Building 655 Road 3614,
Block 436,
Seef Area,
Bahrain
Phone
+973 1770 8118
+973 1770 8118
Email
marketing@esbi.ie
Oman Office
Address
ESB International Office 206,
2nd Floor, Holiday Inn Al,
Mazoon Street South Al,
Mawaleh, Muscat P.O. Box,
P.C 118 Sultanate of Oman
2nd Floor, Holiday Inn Al,
Mazoon Street South Al,
Mawaleh, Muscat P.O. Box,
P.C 118 Sultanate of Oman
Phone
+973 1770 8118
+973 1770 8118
Email
marketing@esbi.ie