Upgrading Hidd Substation in Bahrain

Mar 3, 2021, 14:00 PM
Title : Upgrading Hidd Substation in Bahrain
Location : Bahrain
Intro Title : The Project
Section 1 Title : What we delivered
Section 2 Title : The Results
Section 3 Title :
Is featured : No

The Electricity and Water Authority (EWA) appointed ESB International to conduct the studies, design, tender evaluation, and supervision of the upgrade f the Integrated Control System (ICS) for Hidd 220 kV Bulk Supply Point substation. 

Graphical image showing a gear and some lines and circles

  • Hot-Hot Gateways upgrade    
  • Upstream IEC104 Protocol 
  • Downstream IEC61850 Protocol 
  • Fibre cables and PRP network configuration 
  • Human Machine Interface 
  • SDH (WAN) telecommunication 
  • Uninterrupted Power Supply (UPS) 
  • Bay Control Units (BCUs) 
  • Cyber Security 

 

Icon of a globe with a circle containing a check mark

  • Reduced the total cost of ownership by diminishing maintenance costs. 
  • Boosted performance, reliability, and efficiency while reducing downtime. 
Categories : Transmission & Distribution
locations : Bahrain
Photograph of an energy station with a checkered red and white tower on the left Photograph of an energy station with a checkered red and white tower on the left
Visual List : Case Study List - Upgrading Hidd Substation in Bahrain
Quote :

Contact Us

Dublin Office

Address
ESB International,
One Dublin Airport Central,
Dublin Airport Cloghran,
Co Dublin,
K67XF72
Phone +353 1 703 8000 +353 1 703 8000

Bahrain Office

Address
ESB International Office 1002,
Building 655 Road 3614,
Block 436,
Seef Area,
Bahrain
Phone +973 1770 8118 +973 1770 8118

Oman Office

Address
ESB International Office 206,
2nd Floor, Holiday Inn Al,
Mazoon Street South Al,
Mawaleh, Muscat P.O. Box,
P.C 118 Sultanate of Oman
Phone +973 1770 8118 +973 1770 8118